Back to Vessels

3000 DWT PLATFORM SUPPLY VESSEL

A Bureau Veritas classed electric hybrid offshore support vessel engineered by BlueGen Marine for supply, fire-fighting and oil spill recovery operations across India & the Middle East — combining Dynapos AM/AT R dynamic positioning with Electric Hybrid (PM) propulsion.

LOA 72.0m 12 knots @ Design Draft 3000 Ton DWT

OUTLINE SPECIFICATION

Principal particulars for the BlueGen Marine 3000 DWT Platform Supply Vessel, classed by Bureau Veritas for unrestricted navigation.

Principal Particulars

Vessel TypeOffshore Support Vessel, Fire Fighting & Oil Spill Recovery
BuilderBlueGen Marine Pvt. Ltd.
DesignerBlue Marine Solutions
ClassificationBureau Veritas
NotationHULL, MACH Offshore Support Vessel, Supply-HNLS, Oil Recovery (Second-Line), Fire-Fighting 1, Heavycargo (Main Deck, 50 KN/M²), SP60, Battery System, Unrestricted Navigation, SDS, Cleanship, Inwatersurvey, Comf-Noise 3, Comf-VIB 3, +AUT-UMS, +Dynapos AM/AT R, Electric Hybrid (PM)
Length Overall72.00 m (Approx)
Rule Length67.00 m
Beam Moulded16.00 m
Depth Moulded7.00 m
Max. Draft5.80 m
Gross Tonnage< 3000

Propulsion System

Main GENSET4 x 1000 KWe (Approx)
Power Battery1 x 800 KWh (Approx)
Main Thrusters2 x 1200 KW (Approx)
Bow Thrusters2 x 800 KW (Approx)
Emerg. Genset1 x 99 kW (Approx)

Performance

Endurance30 days (Approx)
DWT Max3000 ton (Approx)
Speed @ Design Draft12 knots (Approx)
Cargo Deck Area610 m² (Approx)
Deck Load5 T/m²
Deck Cargo1000 Ton (Approx)

Tank Capacities

Fuel Oil720 m³ (Approx)
Potable Water450 m³ (Approx)
Technical Fresh Water960 m³ (Approx)
Mud / Brine / ORC800 m³ (Approx)
Dry Bulk200 m³ (Approx)
Special Cargo100 m³ (Approx)

Deck Layout

Deck Crane1 x 3.0t @ 10m, 0-20m/min Electric-Hydraulically Driven
Anchor Winch2 x Hydraulically Driven, 75KN 1st Layer Windlass & Winch with Warping Head
Capstan2 x Hydraulically Driven Vertical Capstan 50KN @ 0-15m/min
Tugger Winch2 x Hydraulically Driven Single Drum Winch, Brake 300KN, First Layer 100KN @ 0-10m/min
Anchor2 x HPP AC-14 Anchor
Anchor Chain2 x AM3

External Fire Fighting

Fi-Fi Set2 x Fire-Fighting Pump 1400 m³/hr
Fire Monitors2 x 1200 m³/hr Water & 300 m³/hr Foam (Remote or Manual Control)

Accommodation

Total POBMax. 60 Persons (MLC 2006)

LSA & FFA Equipment

Fast Rescue Craft1 x 6 Persons (SOLAS)

Nautical & Communication Equipment

GMDSS Equipment2 x Area A1+A2+A3
Radar1 x X-Band, 1 x S-Band
Contact BlueGen Marine

GET IN TOUCH

Interested in the 3000 DWT Platform Supply Vessel? Reach out to our corporate office or visit the shipyard facility under development at Ponnani.

Corporate Office

Alfa Horizon Tower 1,
5 F DNo:13/420/5D&5E, Near ICTT Vallarpadam,
Ernakulam Dist, Kerala, India-682031
info@bluegenmarine.com

View on Map
Shipyard Facility

BlueGen Marine Pvt Ltd.
Ponnani Nagaram. P. O,Ponnani, Malappuram Dist
Kerala, India-679583

View on Map